Sukhatankar, L.M
PMTS (Predetermined Motion Time Systems) and production engineer - 1983 - 13-20 - Mar.
Time and Motion Study
PMTS (Predetermined Motion Time Systems) and production engineer - 1983 - 13-20 - Mar.
Time and Motion Study
