| 000 -LEADER |
| fixed length control field |
01046pab a2200181 454500 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
180718b2013 xxu||||| |||| 00| 0 eng d |
| 100 ## - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Pritchett, Lant |
| 245 ## - TITLE STATEMENT |
| Title |
The World Bank and public sector management: What next |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
p.413-419. |
| 362 ## - DATES OF PUBLICATION AND/OR SEQUENTIAL DESIGNATION |
| Dates of publication and/or sequential designation |
Sep |
| 520 ## - SUMMARY, ETC. |
| Summary, etc. |
The new World Bank strategy on Public Sector Management (PSM) has to be judged against the magnitude of the problems it faces. Two of these are what to do about failed and failing states and what to do about the stagnation of progress in 'flailing' states. On both of these fronts the gap between what the world of action wants - an implementable action plan to tackle tough problems like Afghanistan - and what the PSM strategy does (and quite probably can) deliver is wide. This article proposes 'problem-driven iterative analysis' as one way of bridging the gap. - Reproduced. |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
World Bank |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Public administration |
| 773 ## - HOST ITEM ENTRY |
| Main entry heading |
International Review of Administrative Sciences |
| 908 ## - PUT COMMAND PARAMETER (RLIN) |
| Put command parameter |
N |
| 909 ## - |
| -- |
101696 |