Planning, tracking, and reducing a complex project's value at risk (Record no. 512772)

000 -LEADER
fixed length control field 01732nam a2200157 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 191217b ||||| |||| 00| 0 eng d
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Browning, Tyson R.
245 ## - TITLE STATEMENT
Title Planning, tracking, and reducing a complex project's value at risk
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of publisher, distributor, etc Project Management Journal
300 ## - PHYSICAL DESCRIPTION
Extent 50(1), 2019: p.71-85.
520 ## - SUMMARY, ETC.
Summary, etc Uncertainty, risk, and rework make it extremely challenging to meet goals and deliver anticipated value in complex projects, and conventional techniques for planning and tracking earned value do not account for these phenomena. This article presents a methodology for planning and tracking cost, schedule, and technical performance (or quality) in terms of a project’s key value attributes and threats to them. It distinguishes four types of value and two general types of risks. The “high jumper” analogy helps to consider how high the “bar” is set for a project (its set goals) and therefore how challenging and risky it will be. A project’s capabilities as a “jumper” (to clear the bar and meet its goals) determine the portion of its value at risk (VaR). By understanding the amounts of value, risk, and opportunity in a project, project managers can design it for appropriate levels of each. Project progress occurs through reductions in its VaR: Activities “add value” by chipping away at the project’s “anti-value”—the risks that threaten value. This perspective on project management incentivizes generating results that eliminate these threats, rather than assuming that value exists until proven otherwise. - Reproduced.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Project design
9 (RLIN) 14617
773 ## - HOST ITEM ENTRY
Main entry heading Project Management Journal
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
Subject DIP Project management
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Item type Articles
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent location Current location Date acquired Serial Enumeration / chronology Barcode Date last seen Koha item type
          Indian Institute of Public Administration Indian Institute of Public Administration 2019-12-17 50(1), 2019: p.71-85. AR122100 2019-12-17 Articles

Powered by Koha