Revisiting project delivery performance: Evidence from Swedish transport infrastructure (Record no. 529992)

000 -LEADER
fixed length control field 01771nam a22001457a 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250520b ||||| |||| 00| 0 eng d
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name 07 Chapman, Paul
245 ## - TITLE STATEMENT
Title Revisiting project delivery performance: Evidence from Swedish transport infrastructure
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Project Management Journal
300 ## - PHYSICAL DESCRIPTION
Extent 55(6), Dec, 2024: p.689-707
520 ## - SUMMARY, ETC.
Summary, etc This study of Swedish road and rail project performance challenges understanding of project success and presents findings that run counter to the widely held position that transport infrastructure delivery performance and outcomes are persistently poor. Both road and rail investments proved economically profitable and were typically delivered to budget, evidence that questions theory claiming optimism bias and malicious agency dynamics such as strategic misrepresentation are endemic in decision-making during planning and persistently cause poor project performance. Summary findings on the performance of Swedish transport infrastructure projects are: 93% of road projects achieved intended benefits, 86% returned positive net present value, and cost overrun was typically 2.7%. Road projects typically achieve a net present value of 1.6 against an estimate of 0.6. 70% of rail projects achieved intended benefits, 63% returned positive net present value, and typical cost performance was -1.8% underrun. This contribution opens new avenues for research by scholars to explain this apparent success and why some projects, even in Sweden, fail.- Reproduced

https://journals.sagepub.com/doi/full/10.1177/87569728241257391
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Transport, Infrastructure, Benefits realization, Economic productivity, Ex-post evaluation.
9 (RLIN) 53373
773 ## - HOST ITEM ENTRY
Main entry heading Project Management Journal
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Item type Articles
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent location Current location Date acquired Serial Enumeration / chronology Barcode Date last seen Koha item type
          Indian Institute of Public Administration Indian Institute of Public Administration 2025-05-20 55(6), Dec, 2024: p.689-707 AR135818 2025-05-20 Articles

Powered by Koha