| 000 -LEADER |
| fixed length control field |
01337pab a2200169 454500 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
180718b2002 xxu||||| |||| 00| 0 eng d |
| 100 ## - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Ruet, Joel |
| 245 ## - TITLE STATEMENT |
| Title |
The state electricity boards: Private vs. public `entreprisation' |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Date of publication, distribution, etc. |
2002 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
p.29-49. |
| 362 ## - DATES OF PUBLICATION AND/OR SEQUENTIAL DESIGNATION |
| Dates of publication and/or sequential designation |
Jan-Mar |
| 520 ## - SUMMARY, ETC. |
| Summary, etc. |
The poor financial and technical condition of the Indian power sector - especially State Electricity Boards (SEBs) - is widely acknowledged. There is less consensus on its roots, and solutions are long to emerge. This article insists on the systemic and structural roots of inefficiency, and focuses pointedly on the administration - like decision-making process in SEBs and on its impact on efficiency. it is shown that SEBs have neither been asked to look for cost efficiency, nor given the means to do it. Actually, there is a need for `entreprisation' of SEBs (turning them into firms, after a concept coined from the study of post-socialist countries), which is merely different from the so-called corporatisatiion presently promoted. The article draws the limits and bottlenecks of both public and private frameworks for this exercise, especially in terms of redistributive effects. - Reproduced. |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Power industry |
| 773 ## - HOST ITEM ENTRY |
| Main entry heading |
Indian Journal of Public Administration |
| 908 ## - PUT COMMAND PARAMETER (RLIN) |
| Put command parameter |
N |
| 909 ## - |
| -- |
53777 |