Dam of division: understanding the Baglihar dispute (Record no. 66354)

000 -LEADER
fixed length control field 00752pab a2200169 454500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180718b2005 xxu||||| |||| 00| 0 eng d
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mohanty, Tapan R.
245 ## - TITLE STATEMENT
Title Dam of division: understanding the Baglihar dispute
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2005
300 ## - PHYSICAL DESCRIPTION
Extent p.3155-158.
362 ## - DATES OF PUBLICATION AND/OR SEQUENTIAL DESIGNATION
Dates of publication and/or sequential designation 16 Jul
520 ## - SUMMARY, ETC.
Summary, etc. The complaint of Pakistan on the Baglihar project is that the design permits India to potentially cause a lot of harm by storing water during the dry season. If India had provided the design information earlier rather than stonewalling the Pakistani queries, it could have saved the country some embarrassment. - Reproduced.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water supply
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Khan, Adil Hasan
773 ## - HOST ITEM ENTRY
Main entry heading Economic and Political Weekly
909 ## -
-- 66354
Holdings
Withdrawn status Lost status Damaged status Not for loan Permanent Location Current Location Date acquired Serial Enumeration / chronology Barcode Date last seen Price effective from Koha item type
        Indian Institute of Public Administration Indian Institute of Public Administration 2018-07-19 Volume no: 40, Issue no: 29 AR66806 2018-07-19 2018-07-19 Articles

Powered by Koha