Normal view MARC view ISBD view

Role of communication in large infrastructure: the Bumbuna hydroelectric project in post-conflict Sierra Leone by Leonardo Mazzei and Gianmarco Scuppa

By: Mazzei, Leonardo.
Contributor(s): Scuppa, Gianmarco.
Material type: materialTypeLabelBookSeries: World Bank working paper; no. 84. Publisher: Washington, D.C. World Bank 2006Description: 42p.ISBN: 0821366823.Subject(s): Hydroelectric power plants --Sierra Leone | Water-power --Sierra Leone | Communication in rural development --Sierra Leone | Infrastructure (Economics) --Sierra Leone | Bumbuna Hydroelectric ProjectDDC classification: I M459
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
WB WB Indian Institute of Public Administration
I M459 (Browse shelf) Available WB11111

There are no comments for this item.

Log in to your account to post a comment.

Powered by Koha