Normal view MARC view ISBD view

Transmission trap

By: Das,Puja.
Material type: materialTypeLabelBookPublisher: Down to Earth Description: 34(10), Oct 1-15, 2025: p.18-21. In: Down to EarthSummary: Solar and wind power project are forcing curtailments, which developers and industry analysts attribute to delays in construction of electricity transmission lines and incarnate demand forecasting. –Reproduced
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Vol info Status Date due Barcode
Articles Articles Indian Institute of Public Administration
34(10), Oct 1-15, 2025: p.18-21 Available AR137517

Solar and wind power project are forcing curtailments, which developers and industry analysts attribute to delays in construction of electricity transmission lines and incarnate demand forecasting. –Reproduced

There are no comments for this item.

Log in to your account to post a comment.

Powered by Koha