| 000 | 00365cam a22001337a 4500 | ||
|---|---|---|---|
| 008 | 180718b1980 xxu||||| |||| 00| 0 eng d | ||
| 082 | _aL64 St12 | ||
| 245 |
_aProject cost control: using networks _cedited by C. Staffurth |
||
| 250 | _a2nd ed. | ||
| 260 |
_aLondon _bHeinemann _c1980 |
||
| 300 | _a118p. | ||
| 650 | _aCost-benefit analysis | ||
| 700 | _aStaffurth, C. | ||
| 999 |
_c354833 _d354833 |
||