Is total quality management feasible in a developing context? The employee's perspective in the United Arab Emirates public sector (Record no. 99434)

000 -LEADER
fixed length control field 00877pab a2200181 454500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180718b2013 xxu||||| |||| 00| 0 eng d
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mansour, Ahmed
245 ## - TITLE STATEMENT
Title Is total quality management feasible in a developing context? The employee's perspective in the United Arab Emirates public sector
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent p.98-111.
362 ## - DATES OF PUBLICATION AND/OR SEQUENTIAL DESIGNATION
Dates of publication and/or sequential designation Jan
520 ## - SUMMARY, ETC.
Summary, etc. The paper uses empirical survey data collected from the UAE government employees regarding their attitudes toward the application to the public sector. The purpose of the paper is to gauge the gap between actual employees' attitudes and the required attitudes necessary for the implementation of TQM in the public sector. - Reproduced.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Total quality management
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Jakka, Atteq
773 ## - HOST ITEM ENTRY
Main entry heading International Journal of Public Administration
908 ## - PUT COMMAND PARAMETER (RLIN)
Put command parameter N
909 ## -
-- 99435
Holdings
Withdrawn status Lost status Damaged status Not for loan Permanent Location Current Location Date acquired Serial Enumeration / chronology Barcode Date last seen Price effective from Koha item type
        Indian Institute of Public Administration Indian Institute of Public Administration 2018-07-19 Volume no: 36, Issue no: 2 AR99895 2018-07-19 2018-07-19 Articles

Powered by Koha